← All resources

Performance plans

How to Put an Employee on a PIP (and Have the Conversation)

By Jon Kludt, Business Coach · Published · Updated · 8 min read

The short answer

Use a PIP only after earlier coaching conversations haven’t worked. Draft it with HR first: the gap in facts, two or three measurable goals, the support you’ll give, weekly check-ins, and an end date. In the meeting, say what it’s about up front, ask for their view, and agree each goal.

A manager with a folder talks with an employee in a small private meeting room.

A performance improvement plan has a bad reputation. Plenty of people assume a PIP is just paperwork before someone gets let go, and sometimes that’s exactly how it’s used.

It doesn’t have to be. Used honestly, a PIP is a short, clear, written agreement: here’s the gap, here’s what good looks like, here’s the support you’ll get, and here’s when we’ll decide. Some people close the gap. Some don’t. Either way, they knew exactly where they stood, which is more than many people get.

This guide is about the conversation, the part most managers find hardest.

Before anything else: this is a conversation guide, not legal or HR advice. PIPs often have legal and policy implications, and the rules vary by company, country, and state. Talk to your HR team (or whoever handles people policy where you work) before you start, use your company’s template and process if there is one, and follow their guidance where it differs from anything here.

When is a PIP the right tool?

A PIP makes sense when:

  • the performance gap is specific and observable (missed deadlines, error rates, targets, process not followed), not a vague sense that someone “isn’t working out”;
  • you’ve already raised it in ordinary coaching conversations, more than once, and it hasn’t improved;
  • the person could realistically close the gap with clear goals and support in the time available.

A PIP is the wrong tool when:

  • you haven’t had the earlier conversations. If this is the first time they’re hearing about the problem in any serious way, start with a direct coaching conversation instead. A PIP shouldn’t be how someone finds out.
  • the issue is conduct, not performance. Harassment, dishonesty, or safety violations usually follow a different policy. Ask HR.
  • you’ve already decided. If no result would change your mind, a PIP is a pretense, and people can tell. Talk to HR about your real options instead.
  • the cause is outside their control. If the role changed, the tools are broken, or something is going on in their life, address that first. There’s a guide for an employee with personal problems if that’s the situation.

What goes in a performance improvement plan?

Get the written plan drafted and reviewed by HR before you sit down. Most plans have the same five parts. This is the Come Prepared step of the COACH Conversation, written down.

  1. The gap, in facts. What’s expected, what’s been happening, and over what period. “Weekly reports are due Friday at 5pm. Over the last eight weeks, five were submitted the following Monday or later.” No adjectives like “careless” or “lazy.” Just what happened.
  2. Two or three measurable goals. Not ten. Each one should be something you can both look at on the end date and agree whether it happened. “All weekly reports submitted by Friday 5pm.” “Error rate on processed orders at or below the team standard.”
  3. The support you’ll provide. Training, more frequent check-ins, an example to work from, removing a competing priority. If the plan is all demands and no support, it isn’t really an improvement plan.
  4. Check-in dates. Weekly is common. Put them in the calendar now.
  5. The end date and what happens then. Be clear that you’ll review against the goals on a specific date, and say plainly what the possible outcomes are under your company’s policy. Don’t overstate or understate them. HR should help you word this part.

How do you open the PIP conversation?

Keep the meeting private, and book enough time that nobody is rushing. Have the written plan ready, but don’t hand it over in the first minute. Talk first.

Say what the meeting is about at the start. Delaying it only makes it worse.

“I want to talk about something serious today, and I want to be clear and fair about it. We’ve talked several times about the weekly reports and the order errors, and things haven’t improved enough. So I’m putting a formal performance improvement plan in place. I’ll walk you through exactly what it says, and I want to hear your view.”

Then stop and let them respond. Expect surprise, frustration, or silence. All are normal.

Presenting the gap

Go through the facts calmly, and refer back to earlier conversations.

“We first talked about the Friday deadline in August, and again in September. Since then, five of the last eight reports came in on Monday or later. When that happens, the client update slips a day, and the team has to rework the numbers.”

Then ask, and mean it: “What’s your view of what’s been getting in the way?”

Their answer matters. Sometimes it reveals something you didn’t know and should fix. Sometimes it’s defensive. Either way, listen fully before you respond. If they push back on the facts, check the facts. If they push back on the plan itself, acknowledge it without arguing: “I hear that you think this is unfair. I’d still like to walk through it, because the goal is for this to work.”

How do you agree on goals and support?

Go through each goal and check it’s understood.

“The first goal is every weekly report in by Friday at 5pm for the next six weeks. Is anything unclear about what that means?”

Then ask what would help: “What would make that achievable?” If they name something reasonable, like fewer ad-hoc requests on Fridays or a template, add it to the support section. People take more ownership of a plan they had a hand in.

Be honest about what you can’t offer. Promising support you won’t deliver undermines the whole plan.

How should PIP check-ins work?

The weekly check-in is the most important part of a PIP and the part most often skipped. Keep each one short and consistent:

  • What’s the evidence this week? Look at the actual reports, numbers, or outcomes together.
  • What’s working? Name improvement specifically when you see it. It’s easy to forget during a PIP, and it matters.
  • What’s getting in the way? Remove obstacles you can.
  • Where do things stand? Be honest every week, so the final review contains no surprises. “This week you’re on track for goal one. Goal two is still behind, and here’s what I’m seeing.”

Write a short note after each one and share it. It keeps you both aligned and gives you an accurate record.

If deadlines are the main issue, the guide for an employee who misses deadlines has questions that work well in these check-ins. If it’s about steps being skipped, see employee who doesn’t follow process.

What happens at the end of a PIP?

On the end date, review the evidence against each goal together.

If they’ve met the goals, say so clearly and specifically. “You hit all three. The reports have been on time for six weeks straight, and the error rate is at standard. The plan is complete. I want to keep our weekly check-ins going for another month so this sticks.”

If they’ve partly met them, follow your company’s policy and talk to HR about whether an extension is appropriate. If they haven’t, follow the process HR has set out. Either way, the conversation should confirm what both of you have already seen in the weekly check-ins.

What should you not say when putting someone on a PIP?

  • “This is just a formality.” It isn’t, and they know it.
  • “Everyone gets one of these at some point.” Probably untrue, and it undercuts the seriousness.
  • “Don’t worry, I’m sure you’ll be fine.” You can’t promise an outcome. Say you want it to work and you’ll support them.
  • Comments about character or attitude. Stay on observable work.
  • Anything about the outcome you haven’t cleared with HR.

Can a PIP be avoided?

The best PIP is the one you never need. Most performance gaps can be closed earlier, with a direct, specific conversation the first time the problem shows up, and regular follow-up after. If that’s where you are now, start with the guide to coaching an underperforming employee or try the free Conversation Planner: describe the person and the behavior and get an opening line and questions in a minute.

If you want the full method (word-for-word scripts, the Difficult Conversations Playbook, the masterclass, and the COACH Certified™ Manager credential), the COACH Kit is a one-time $99.

Get the COACH Kit →

Related: How to Coach an Underperforming Employee · Employee Not Meeting Expectations · How to Hold Employees Accountable

Frequently asked questions

Is a PIP just paperwork before firing someone?

It doesn’t have to be. Used honestly, it’s a short written agreement about the gap, what good looks like, the support they’ll get, and when you’ll decide. If you’ve already decided and no result would change your mind, don’t use a PIP. Talk to HR about your real options instead.

Should the employee hear about the problem for the first time in a PIP?

No. A PIP should come after you’ve raised the issue in ordinary coaching conversations more than once. If this is the first serious mention, start with a direct coaching conversation instead.

How many goals should a PIP have?

Two or three measurable ones. Each should be something you can both look at on the end date and agree whether it happened.

How often should you check in during a PIP?

Weekly is common. Keep each check-in short, look at the actual evidence together, name improvement when you see it, and be honest about where things stand so the final review holds no surprises.

Should I involve HR before putting someone on a PIP?

Yes. PIPs often have legal and policy implications that vary by company, country, and state, so talk to HR before you start and use your company’s template and process if there is one.

Word-for-word: what to say

Have this conversation coming up?

Describe the person and the behavior — get a free, word-for-word COACH plan in 60 seconds.

Plan my conversation — free →

Or get the one-page COACH guide by email:

Turn this into a habit your whole team feels.

The COACH Kit gives you the full system — masterclass, scripts, and the one-page form — for $99.

Get the COACH Kit →

Keep reading